LEONI · Nov 2017 — Sep 2020

G2X — BMW Z4 & Toyota Supra New Project

Stood up systems for a major new automotive program from day one: positioning lines, installing and configuring all production IT.

0→1 Setup
Systems
Manufacturing
Customers
BMW · Toyota
Daily production
300 harnesses
Equivalent output
~300 cars/day
01

Problem

  • G2X was a large new program (BMW Z4 and Toyota Supra) launching in the Niš plant with no existing setup to build on.
  • Everything — line positioning, computers, printers, scanners — had to be installed and configured from scratch.
02

Research & Discovery

  • Joined from the very first day to understand the program's layout and system requirements.
  • Worked through how the new lines would integrate with the LEPS production system.
03

Solution

  • Positioned lines and installed & configured the full production IT stack (computers, printers, scanners).
  • Iterated day to day as the project developed and grew, keeping systems stable as scope expanded.
04

Impact & Metrics

  • The project developed from an empty floor into a growing, scaled-up program.
  • Reached steady-state daily production of 300 harnesses — equivalent to outfitting roughly 300 vehicles per day at full scale.
05

Trade-offs

Every project involves choices. Here I explain what I didn't do, what I chose instead, and why that was the better call for the business.

  • Built for growth from the start (configurable, documented setup) rather than the quickest possible first install.
  • Focused on system stability over chasing every optimization while scope was still expanding.
06

What I Learned

  • Being there from day one builds the context that makes every later decision faster and better.
  • 0→1 work rewards setting strong foundations: the structure you create early compounds as the program scales.